---
title: "The basic design was developed by Danish Knud E. Hansen, while the yard was responsible for… — shipping00 — DecisionGateway"
description: "statement by shipping00, recorded 2026-11-07 — verbatim quote and source citation."
canonical_url: "https://dgw.tmarket.io/claims/01a1bbb3-85e3-78d1-b5ab-69d86c6b1cb9"
meta:
  "og:description": "statement by shipping00, recorded 2026-11-07 — verbatim quote and source citation."
  "og:image": "https://dgw.tmarket.io/og.jpg"
  "og:image:alt": "White network of connected nodes crossed by a timeline on black"
  "og:image:height": "1024"
  "og:image:width": "1024"
  "og:title": "The basic design was developed by Danish Knud E. Hansen, while the yard was responsible for… — shipping00 — DecisionGateway"
  "twitter:image": "https://dgw.tmarket.io/og.jpg"
---

> Index of every page on this site: [llms.txt](https://dgw.tmarket.io/llms.txt)

statementSaid on 2026-11-07

# **The basic design was developed by Danish Knud E. Hansen, while the yard was responsible for detailed design and turnkey construction.**

A statement by [**shipping00**](https://dgw.tmarket.io/actors/01a1cbda-3034-79b1-bf83-ab01c0e9ae01), said on 2026-11-07. Statements are as reported by the cited publishers — not verified by DecisionGateway.

> *Базовый проект разработала датская Knud E. Hansen, а верфь отвечала за детальное проектирование и строительство по контракту «под ключ».*

shipping00Published 2026-11-07 [ Read source](https://t.me/shipping00/47251)

[**shipping00 dossier **](https://dgw.tmarket.io/actors/01a1cbda-3034-79b1-bf83-ab01c0e9ae01)

## **Discussion**

## **Related claims**

[**The start of construction was given by Head of Bashkortostan Radiy Khabirov and Khokim of Tashkent region Zoir Mirzaev.**rustorgpred · statement](https://dgw.tmarket.io/claims/01a1b679-6b67-7a83-9fa0-9b631d21a2ac) [**According to Meshkinfam, a contractor was mobilized within three days despite wartime restrictions; because no finished design existed at the start, engineers developed plans in parallel with construction and refined the scope as work progressed.**Mohammad Meshkinfam · statement](https://dgw.tmarket.io/claims/01a1d01f-5eed-730c-81d5-360baccd2c03) [**Developers explained the restriction as protection of buyers and the need to ensure completion of construction.**Разработчики · statement](https://dgw.tmarket.io/claims/01a1d1b7-e1e8-7101-9a29-47ae63365514) [**The Zelenodolsk Gorky Plant was headed by former Granit-Electron concern head Dmitry Ermakov, and his predecessor Alexander Filippov moved to the position of deputy general director for production at the Ak Bars shipbuilding corporation.**businessgazeta · statement](https://dgw.tmarket.io/claims/01a1c8b5-2fa7-781b-ac6e-d74e962db514) [**Yurii Hanushchak of the Institute for Territorial Development should be thanked for this reform.**costukraine · statement](https://dgw.tmarket.io/claims/01a1cd26-9cb6-78ff-a29f-9c4cacb1bb28) [**Gemont is the former general contractor for the construction of the EP-600 ethylene complex.**businessgazeta · statement](https://dgw.tmarket.io/claims/01a1c8b3-3eef-73cb-9512-5307a0d69a2c)

## **More claims by shipping00**

[**His sons Panos and Thanassis Laskaridis joined the business in the 1970s, turning it into an international shipping group; Laskaridis Shipping was founded in 1977 and Lavinia Corporation in 1978.**statement](https://dgw.tmarket.io/claims/01a1d3f4-01c8-70a2-99f6-62471bb5ff5d) [**Konstantinos Laskaridis laid the foundations of the family maritime business, starting in the fishing sector in the 1950s and creating an independent shipping enterprise in 1967.**statement](https://dgw.tmarket.io/claims/01a1d3f4-01ab-7852-89cf-8d6a99ef8070) [**In 2023–2024 the group ordered 10 Kamsarmax bulk carriers of about 82,000 dwt at the Hengli shipyard.**statement](https://dgw.tmarket.io/claims/01a1d3f4-0197-7a3c-b4cc-f2ace3ec0d68) [**Laskaridis previously placed orders at Hengli for 2 VLCC supertankers, but subsequently transferred these construction slots to the international commodities trader Trafigura.**statement](https://dgw.tmarket.io/claims/01a1d3f4-0183-76be-8488-365219267b92) [**The combined fleet and orderbook number 10 tankers: 5 MR2 product tankers of 49,800 dwt each and 5 LR2.**statement](https://dgw.tmarket.io/claims/01a1d3f4-0177-7d96-bf9c-b863376953fe)

[All claims by shipping00](https://dgw.tmarket.io/claims?claimant_id=01a1cbda-3034-79b1-bf83-ab01c0e9ae01)

[All claims](https://dgw.tmarket.io/claims)

```json
{"@context":"https://schema.org","@graph":[{"@id":"https://dgw.tmarket.io/#website","@type":"WebSite","description":"Decisions, events and falsifiable forecasts from 4,000+ Telegram channels — every claim cited. Read free.","name":"DecisionGateway","url":"https://dgw.tmarket.io/","publisher":{"@id":"https://dgw.tmarket.io/#identity"}},{"@id":"https://dgw.tmarket.io/claims/01a1bbb3-85e3-78d1-b5ab-69d86c6b1cb9#webpage","@type":"WebPage","description":"statement by shipping00, recorded 2026-11-07 — verbatim quote and source citation.","name":"The basic design was developed by Danish Knud E. Hansen, while the yard was responsible for… — shipping00 — DecisionGateway","url":"https://dgw.tmarket.io/claims/01a1bbb3-85e3-78d1-b5ab-69d86c6b1cb9","breadcrumb":{"@id":"https://dgw.tmarket.io/claims/01a1bbb3-85e3-78d1-b5ab-69d86c6b1cb9#breadcrumb"},"isPartOf":{"@id":"https://dgw.tmarket.io/#website"},"potentialAction":[{"@type":"ReadAction","target":["https://dgw.tmarket.io/claims/01a1bbb3-85e3-78d1-b5ab-69d86c6b1cb9"]}]},{"@id":"https://dgw.tmarket.io/#identity","@type":"Organization","name":"DecisionGateway","url":"https://dgw.tmarket.io"},{"@id":"https://dgw.tmarket.io/claims/01a1bbb3-85e3-78d1-b5ab-69d86c6b1cb9#breadcrumb","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","name":"Home","item":"https://dgw.tmarket.io","position":1},{"@type":"ListItem","name":"Claims","item":"https://dgw.tmarket.io/claims","position":2},{"@type":"ListItem","name":"The basic design was developed by Danish Knud E. Hansen,…","position":3}]},{"@id":"https://dgw.tmarket.io/claims/01a1bbb3-85e3-78d1-b5ab-69d86c6b1cb9#/schema/quotation/1","@type":"Quotation","dateCreated":"2026-11-07","isBasedOn":"https://t.me/shipping00/47251","text":"Базовый проект разработала датская Knud E. Hansen, а верфь отвечала за детальное проектирование и строительство по контракту «под ключ».","url":"/claims/01a1bbb3-85e3-78d1-b5ab-69d86c6b1cb9","spokenByCharacter":{"@type":"Person","name":"shipping00","@id":"/actors/01a1cbda-3034-79b1-bf83-ab01c0e9ae01"}}]}
```

## Sitemap

See the full [sitemap](https://dgw.tmarket.io/sitemap.md) for all pages.
