---
title: "The complex will include a network of bicycle paths, a large underground bicycle parking lot and… — transport_il — DecisionGateway"
description: "prediction by transport_il, recorded 2026-10-14 — verbatim quote and source citation."
canonical_url: "https://dgw.tmarket.io/claims/01a1d27e-a4c5-792e-bcfd-6db0f8386aa7"
meta:
  "og:description": "prediction by transport_il, recorded 2026-10-14 — verbatim quote and source citation."
  "og:image": "https://dgw.tmarket.io/og.jpg"
  "og:image:alt": "White network of connected nodes crossed by a timeline on black"
  "og:image:height": "1024"
  "og:image:width": "1024"
  "og:title": "The complex will include a network of bicycle paths, a large underground bicycle parking lot and… — transport_il — DecisionGateway"
  "twitter:image": "https://dgw.tmarket.io/og.jpg"
---

> Index of every page on this site: [llms.txt](https://dgw.tmarket.io/llms.txt)

predictionSaid on 2026-10-14

# **The complex will include a network of bicycle paths, a large underground bicycle parking lot and accessible pedestrian routes.**

A prediction by [**transport\_il**](https://dgw.tmarket.io/actors/01a1d54a-5d47-757a-ad6d-5318392831ea), said on 2026-10-14. Statements are as reported by the cited publishers — not verified by DecisionGateway.

> *בנוסף, יכלול המתחם רשת שבילי אופניים, חניון אופניים תת-קרקעי גדול וצירי הליכה נגישים.*

transport\_ilPublished 2026-10-14 [ Read source](https://t.me/transport_il/3137)

[**transport\_il dossier **](https://dgw.tmarket.io/actors/01a1d54a-5d47-757a-ad6d-5318392831ea)

## **Related claims**

[**A system of short and direct underground passages will enable convenient and fast passage between all means of transport, shorten transfer times and improve accessibility between the metropolitan cities and employment, commerce, culture and leisure centers.**transport\_il · prediction](https://dgw.tmarket.io/claims/01a1d27e-a4e2-7318-afc9-24a69430e3e0) [**A temporary alternative public transportation terminal will be built in place of the designated area, absorbing about 60% of the public transportation activity of the Tel Aviv Central Bus Station.**transport\_il · prediction](https://dgw.tmarket.io/claims/01a1d27f-c673-7ee7-b75e-c754c0ab461f) [**The planning combines green environmental development, a roof over the Ayalon Highway and improvement of urban continuity, while prioritizing pedestrians, cyclists and public transport users.**transport\_il · statement](https://dgw.tmarket.io/claims/01a1d27e-a519-7594-8e75-49302b2c2c49) [**The terminal will operate as an interim solution until the permanent facility is built at the Ben Zvi compound in Holon.**transport\_il · prediction](https://dgw.tmarket.io/claims/01a1d27f-c6a6-7c22-aea4-652deca6c230) [**The new terminal will be built north of Road 44 on a total area of 134 dunams, of which about 41 dunams will serve the facility itself.**transport\_il · prediction](https://dgw.tmarket.io/claims/01a1d27f-c6cc-779e-91cf-d65eebf267ab) [**At night the line's route will be extended to the BIG center in Karmiel and in the opposite direction to the Merkaz HaShmona train station in Haifa.**משרד התחבורה והרשות הארצית לתחבורה ציבורית, בשיתוף חברת אגד · commitment](https://dgw.tmarket.io/claims/01a1d27c-3d00-7497-bb28-608c924c3135)

## **More claims by transport\_il**

[**A designation change was also approved for an underground drainage conduit as part of the "Ayalon River conduit to the sea" project, on an area not exceeding 20 dunams north of Road 44.**investigation](https://dgw.tmarket.io/claims/01a1d27f-c712-7b15-84c0-e61c15ea78aa) [**The approval was given in accordance with the Mikveh Israel Agricultural School Law, which requires dedicated approval for designation changes on the institution's lands.**statement](https://dgw.tmarket.io/claims/01a1d27f-c6e8-7c13-8c13-c31a78787729) [**The new terminal will be built north of Road 44 on a total area of 134 dunams, of which about 41 dunams will serve the facility itself.**prediction](https://dgw.tmarket.io/claims/01a1d27f-c6cc-779e-91cf-d65eebf267ab) [**The terminal will operate as an interim solution until the permanent facility is built at the Ben Zvi compound in Holon.**prediction](https://dgw.tmarket.io/claims/01a1d27f-c6a6-7c22-aea4-652deca6c230) [**A temporary alternative public transportation terminal will be built in place of the designated area, absorbing about 60% of the public transportation activity of the Tel Aviv Central Bus Station.**prediction](https://dgw.tmarket.io/claims/01a1d27f-c673-7ee7-b75e-c754c0ab461f)

[All claims by transport\_il](https://dgw.tmarket.io/claims?claimant_id=01a1d54a-5d47-757a-ad6d-5318392831ea)

[All claims](https://dgw.tmarket.io/claims)

```json
{"@context":"https://schema.org","@graph":[{"@id":"https://dgw.tmarket.io/#website","@type":"WebSite","description":"Decisions, events and falsifiable forecasts from 3,000+ Telegram channels — every claim cited. Read free.","name":"DecisionGateway","url":"https://dgw.tmarket.io/","publisher":{"@id":"https://dgw.tmarket.io/#identity"}},{"@id":"https://dgw.tmarket.io/claims/01a1d27e-a4c5-792e-bcfd-6db0f8386aa7#webpage","@type":"WebPage","description":"prediction by transport_il, recorded 2026-10-14 — verbatim quote and source citation.","name":"The complex will include a network of bicycle paths, a large underground bicycle parking lot and… — transport_il — DecisionGateway","url":"https://dgw.tmarket.io/claims/01a1d27e-a4c5-792e-bcfd-6db0f8386aa7","breadcrumb":{"@id":"https://dgw.tmarket.io/claims/01a1d27e-a4c5-792e-bcfd-6db0f8386aa7#breadcrumb"},"isPartOf":{"@id":"https://dgw.tmarket.io/#website"},"potentialAction":[{"@type":"ReadAction","target":["https://dgw.tmarket.io/claims/01a1d27e-a4c5-792e-bcfd-6db0f8386aa7"]}]},{"@id":"https://dgw.tmarket.io/#identity","@type":"Organization","name":"DecisionGateway","url":"https://dgw.tmarket.io"},{"@id":"https://dgw.tmarket.io/claims/01a1d27e-a4c5-792e-bcfd-6db0f8386aa7#breadcrumb","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","name":"Home","item":"https://dgw.tmarket.io","position":1},{"@type":"ListItem","name":"Claims","item":"https://dgw.tmarket.io/claims","position":2},{"@type":"ListItem","name":"The complex will include a network of bicycle paths, a…","position":3}]},{"@id":"https://dgw.tmarket.io/claims/01a1d27e-a4c5-792e-bcfd-6db0f8386aa7#/schema/quotation/1","@type":"Quotation","dateCreated":"2026-10-14","isBasedOn":"https://t.me/transport_il/3137","text":"בנוסף, יכלול המתחם רשת שבילי אופניים, חניון אופניים תת-קרקעי גדול וצירי הליכה נגישים.","url":"/claims/01a1d27e-a4c5-792e-bcfd-6db0f8386aa7","spokenByCharacter":{"@type":"Person","name":"transport_il","@id":"/actors/01a1d54a-5d47-757a-ad6d-5318392831ea"}}]}
```

## Sitemap

See the full [sitemap](https://dgw.tmarket.io/sitemap.md) for all pages.
