---
title: "A temporary alternative public transportation terminal will be built in place of the designated… — transport_il — DecisionGateway"
description: "prediction by transport_il, recorded 2026-09-08 — verbatim quote and source citation."
canonical_url: "https://dgw.tmarket.io/claims/01a1d27f-c673-7ee7-b75e-c754c0ab461f"
meta:
  "og:description": "prediction by transport_il, recorded 2026-09-08 — verbatim quote and source citation."
  "og:image": "https://dgw.tmarket.io/og.jpg"
  "og:image:alt": "White network of connected nodes crossed by a timeline on black"
  "og:image:height": "1024"
  "og:image:width": "1024"
  "og:title": "A temporary alternative public transportation terminal will be built in place of the designated… — transport_il — DecisionGateway"
  "twitter:image": "https://dgw.tmarket.io/og.jpg"
---

> Index of every page on this site: [llms.txt](https://dgw.tmarket.io/llms.txt)

predictionSaid on 2026-09-08

# **A temporary alternative public transportation terminal will be built in place of the designated area, absorbing about 60% of the public transportation activity of the Tel Aviv Central Bus Station.**

A prediction by [**transport\_il**](https://dgw.tmarket.io/actors/01a1d54a-5d47-757a-ad6d-5318392831ea), said on 2026-09-08. Statements are as reported by the cited publishers — not verified by DecisionGateway.

> *במקום יוקם מסוף תחבורה ציבורית חלופי וזמני, שיקלוט כ-60% מפעילות התחבורה הציבורית של התחנה המרכזית בתל אביב.*

transport\_ilPublished 2026-09-08 [ Read source](https://t.me/transport_il/3130)

[**transport\_il dossier **](https://dgw.tmarket.io/actors/01a1d54a-5d47-757a-ad6d-5318392831ea)

## **Related claims**

[**This is an important milestone in a complex and significant process of evacuating the Tel Aviv Central Bus Station; the approval allows progress in planning the alternative terminal, which will address a central part of public transportation activity in the area and preserve service continuity.**משה בן זקן · statement](https://dgw.tmarket.io/claims/01a1d27f-c7a5-7eda-9d46-7a67fb3dd626) [**The approval received today is a significant step toward advancing an important transportation solution for the Tel Aviv metropolis and evacuating the Central Bus Station; the alternative terminal will allow advancing a more advanced, efficient and accessible public transportation system.**מירי רגב · statement](https://dgw.tmarket.io/claims/01a1d27f-c75c-7029-a45c-f8c2ef197881) [**The terminal will operate as an interim solution until the permanent facility is built at the Ben Zvi compound in Holon.**transport\_il · prediction](https://dgw.tmarket.io/claims/01a1d27f-c6a6-7c22-aea4-652deca6c230) [**The benefit allows evacuees to travel free and without limit across all public transit nationwide, including buses, Israel Railways and light rail, using the Rav-Kav card and validation apps.**transport\_il · statement](https://dgw.tmarket.io/claims/01a1d25c-90a0-7366-b1a9-f75fbc760c88) [**The Metcham is expected to connect the metro, light rail, Israel Railways, high-speed trains and buses in one transport hub.**transport\_il · prediction](https://dgw.tmarket.io/claims/01a1d27e-a48c-7436-92d0-dd805d90114a) [**The Metcham will connect the M1 metro line, the Red and Purple lines of the light rail, the Tel Aviv Savidor Center Israel Railways station, an underground station for high-speed trains and an electric bus terminal.**transport\_il · prediction](https://dgw.tmarket.io/claims/01a1d27e-a4a8-783b-98cf-3a6b8db90f66)

## **More claims by transport\_il**

[**A designation change was also approved for an underground drainage conduit as part of the "Ayalon River conduit to the sea" project, on an area not exceeding 20 dunams north of Road 44.**investigation](https://dgw.tmarket.io/claims/01a1d27f-c712-7b15-84c0-e61c15ea78aa) [**The approval was given in accordance with the Mikveh Israel Agricultural School Law, which requires dedicated approval for designation changes on the institution's lands.**statement](https://dgw.tmarket.io/claims/01a1d27f-c6e8-7c13-8c13-c31a78787729) [**The new terminal will be built north of Road 44 on a total area of 134 dunams, of which about 41 dunams will serve the facility itself.**prediction](https://dgw.tmarket.io/claims/01a1d27f-c6cc-779e-91cf-d65eebf267ab) [**The terminal will operate as an interim solution until the permanent facility is built at the Ben Zvi compound in Holon.**prediction](https://dgw.tmarket.io/claims/01a1d27f-c6a6-7c22-aea4-652deca6c230) [**The Metcham is expected to serve as a main transport gateway to Gush Dan and create an efficient connection between the transport systems and the urban space.**prediction](https://dgw.tmarket.io/claims/01a1d27e-a52e-7f9f-8556-7d7647e3e8ce)

[All claims by transport\_il](https://dgw.tmarket.io/claims?claimant_id=01a1d54a-5d47-757a-ad6d-5318392831ea)

[All claims](https://dgw.tmarket.io/claims)

```json
{"@context":"https://schema.org","@graph":[{"@id":"https://dgw.tmarket.io/#website","@type":"WebSite","description":"Decisions, events and falsifiable forecasts from 3,000+ Telegram channels — every claim cited. Read free.","name":"DecisionGateway","url":"https://dgw.tmarket.io/","publisher":{"@id":"https://dgw.tmarket.io/#identity"}},{"@id":"https://dgw.tmarket.io/claims/01a1d27f-c673-7ee7-b75e-c754c0ab461f#webpage","@type":"WebPage","description":"prediction by transport_il, recorded 2026-09-08 — verbatim quote and source citation.","name":"A temporary alternative public transportation terminal will be built in place of the designated… — transport_il — DecisionGateway","url":"https://dgw.tmarket.io/claims/01a1d27f-c673-7ee7-b75e-c754c0ab461f","breadcrumb":{"@id":"https://dgw.tmarket.io/claims/01a1d27f-c673-7ee7-b75e-c754c0ab461f#breadcrumb"},"isPartOf":{"@id":"https://dgw.tmarket.io/#website"},"potentialAction":[{"@type":"ReadAction","target":["https://dgw.tmarket.io/claims/01a1d27f-c673-7ee7-b75e-c754c0ab461f"]}]},{"@id":"https://dgw.tmarket.io/#identity","@type":"Organization","name":"DecisionGateway","url":"https://dgw.tmarket.io"},{"@id":"https://dgw.tmarket.io/claims/01a1d27f-c673-7ee7-b75e-c754c0ab461f#breadcrumb","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","name":"Home","item":"https://dgw.tmarket.io","position":1},{"@type":"ListItem","name":"Claims","item":"https://dgw.tmarket.io/claims","position":2},{"@type":"ListItem","name":"A temporary alternative public transportation terminal will…","position":3}]},{"@id":"https://dgw.tmarket.io/claims/01a1d27f-c673-7ee7-b75e-c754c0ab461f#/schema/quotation/1","@type":"Quotation","dateCreated":"2026-09-08","isBasedOn":"https://t.me/transport_il/3130","text":"במקום יוקם מסוף תחבורה ציבורית חלופי וזמני, שיקלוט כ-60% מפעילות התחבורה הציבורית של התחנה המרכזית בתל אביב.","url":"/claims/01a1d27f-c673-7ee7-b75e-c754c0ab461f","spokenByCharacter":{"@type":"Person","name":"transport_il","@id":"/actors/01a1d54a-5d47-757a-ad6d-5318392831ea"}}]}
```

## Sitemap

See the full [sitemap](https://dgw.tmarket.io/sitemap.md) for all pages.
