---
title: "Following the company's announcement of 6 October 2026 regarding grid connection of the first part… — אלומיי — DecisionGateway"
description: "statement by אלומיי, recorded recently — verbatim quote and source citation."
canonical_url: "https://dgw.tmarket.io/claims/01a1de08-1d01-7e32-85ed-4242749dafbe"
meta:
  "og:description": "statement by אלומיי, recorded recently — verbatim quote and source citation."
  "og:image": "https://dgw.tmarket.io/og.jpg"
  "og:image:alt": "White network of connected nodes crossed by a timeline on black"
  "og:image:height": "1024"
  "og:image:width": "1024"
  "og:title": "Following the company's announcement of 6 October 2026 regarding grid connection of the first part… — אלומיי — DecisionGateway"
  "twitter:image": "https://dgw.tmarket.io/og.jpg"
---

> Index of every page on this site: [llms.txt](https://dgw.tmarket.io/llms.txt)

statement

# **Following the company's announcement of 6 October 2026 regarding grid connection of the first part of an 87 MW solar facility, the second part of the facility, with 57 MW capacity, was also successfully connected to Italy's national grid and began producing electricity.**

A statement by אלומיי. Statements are as reported by the cited publishers — not verified by DecisionGateway.

> *החברה מעדכנת כי גם החלק השני של המתקן הסולארי, בהספק של 57 מגה-ואט, חובר בהצלחה לרשת החשמל הארצית באיטליה והחל בייצור חשמל.*

tsuatyetertlvPublished 2026-10-29 [ Read source](https://t.me/tsuatyetertlv/2989)

## **Discussion**

## **Related claims**

[**The company announced on 6 October 2026 the grid connection of the first part of an 87 MW solar facility.**אלומיי · statement](https://dgw.tmarket.io/claims/01a1de08-1d37-7d13-a3e5-c3aa652f36bf) [**On 27 October 2026, an 8 MW solar facility built by Elomay Solar Italy Nine S.r.l. was successfully connected to Italy's national electricity grid and began producing electricity.**אלומיי · statement](https://dgw.tmarket.io/claims/01a1de08-1cc9-751f-bfcb-9f16c3de6def) [**The 87 MW solar facility was built by Ellomay Solar Italy Five S.r.l., an Italian private company in which the company holds 51% of the share capital.**אלומיי · statement](https://dgw.tmarket.io/claims/01a1de08-1d13-7568-acac-c4cd62e4615d) [**Each participating meter must have 5 to 10 kWp capacity, installation is limited to registered installers, grid connection must be applied for by 2027-08-31 and completed by 2027-09-30.**post author · statement](https://dgw.tmarket.io/claims/01a1e013-50ae-727c-882e-2fed2189e8eb) [**The Elomay Solar Five facility is located in the Lazio region in central-southern Italy, and its expected cumulative annual electricity output, at a total capacity of 87 MW under the P50 scenario, is about 160 GWh.**אלומיי · statement](https://dgw.tmarket.io/claims/01a1de08-1d25-72b1-94d8-3a2f28124b54) [**The Elomay Solar Nine facility is located in the Marche region in central-northern Italy, and its expected annual electricity output under the P50 scenario is about 13 GWh.**אלומיי · statement](https://dgw.tmarket.io/claims/01a1de08-1cf1-7126-bfeb-688ea87bad2b)

[All claims](https://dgw.tmarket.io/claims)

```json
{"@context":"https://schema.org","@graph":[{"@id":"https://dgw.tmarket.io/#website","@type":"WebSite","description":"Decisions, events and falsifiable forecasts from 4,500+ Telegram channels — every claim cited. Read free.","name":"DecisionGateway","url":"https://dgw.tmarket.io/","publisher":{"@id":"https://dgw.tmarket.io/#identity"}},{"@id":"https://dgw.tmarket.io/claims/01a1de08-1d01-7e32-85ed-4242749dafbe#webpage","@type":"WebPage","description":"statement by אלומיי, recorded recently — verbatim quote and source citation.","name":"Following the company's announcement of 6 October 2026 regarding grid connection of the first part… — אלומיי — DecisionGateway","url":"https://dgw.tmarket.io/claims/01a1de08-1d01-7e32-85ed-4242749dafbe","breadcrumb":{"@id":"https://dgw.tmarket.io/claims/01a1de08-1d01-7e32-85ed-4242749dafbe#breadcrumb"},"isPartOf":{"@id":"https://dgw.tmarket.io/#website"},"potentialAction":[{"@type":"ReadAction","target":["https://dgw.tmarket.io/claims/01a1de08-1d01-7e32-85ed-4242749dafbe"]}]},{"@id":"https://dgw.tmarket.io/#identity","@type":"Organization","name":"DecisionGateway","url":"https://dgw.tmarket.io"},{"@id":"https://dgw.tmarket.io/claims/01a1de08-1d01-7e32-85ed-4242749dafbe#breadcrumb","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","name":"Home","item":"https://dgw.tmarket.io","position":1},{"@type":"ListItem","name":"Claims","item":"https://dgw.tmarket.io/claims","position":2},{"@type":"ListItem","name":"Following the company's announcement of 6 October 2026…","position":3}]},{"@id":"https://dgw.tmarket.io/claims/01a1de08-1d01-7e32-85ed-4242749dafbe#/schema/quotation/1","@type":"Quotation","dateCreated":"2026-10-29","isBasedOn":"https://t.me/tsuatyetertlv/2989","text":"החברה מעדכנת כי גם החלק השני של המתקן הסולארי, בהספק של 57 מגה-ואט, חובר בהצלחה לרשת החשמל הארצית באיטליה והחל בייצור חשמל.","url":"/claims/01a1de08-1d01-7e32-85ed-4242749dafbe"}]}
```

## Sitemap

See the full [sitemap](https://dgw.tmarket.io/sitemap.md) for all pages.
