title: "Each participating meter must have 5 to 10 kWp capacity, installation is limited to registered… — post author — DecisionGateway"
description: "statement by post author, recorded 2026-11-10 — verbatim quote and source citation."
canonical_url: "https://dgw.tmarket.io/claims/01a1e013-50ae-727c-882e-2fed2189e8eb"
meta:
  "og:description": "statement by post author, recorded 2026-11-10 — verbatim quote and source citation."
  "og:image": "https://dgw.tmarket.io/og.jpg"
  "og:image:alt": "White network of connected nodes crossed by a timeline on black"
  "og:image:height": "1024"
  "og:image:width": "1024"
  "og:title": "Each participating meter must have 5 to 10 kWp capacity, installation is limited to registered… — post author — DecisionGateway"
  "twitter:image": "https://dgw.tmarket.io/og.jpg"
---

> Index of every page on this site: [llms.txt](https://dgw.tmarket.io/llms.txt)

statementSaid on 2026-11-10

# **Each participating meter must have 5 to 10 kWp capacity, installation is limited to registered installers, grid connection must be applied for by 2027-08-31 and completed by 2027-09-30.**

A statement by post author, said on 2026-11-10. Statements are as reported by the cited publishers — not verified by DecisionGateway.

> *參與系統每顆電表裝置容量須為5至10瓩（kWp），僅限透過已登記的安裝業者施工，須於2027年8月31日前提出併網申請，並於2027年9月30日前完成併網*

stock17168Published 2026-11-10 [ Read source](https://t.me/stock17168/11815)

## **Discussion**

## **Related claims**

[**Following the company's announcement of 6 October 2026 regarding grid connection of the first part of an 87 MW solar facility, the second part of the facility, with 57 MW capacity, was also successfully connected to Italy's national grid and began producing electricity.**אלומיי · statement](https://dgw.tmarket.io/claims/01a1de08-1d01-7e32-85ed-4242749dafbe) [**The applicant's name must match the electricity meter owner, and each applicant may use the program only once during the entire program period.**post author · statement](https://dgw.tmarket.io/claims/01a1e007-2f62-7c3e-823b-fffe7e9c9c15) [**Applicants must be Thai nationals, residential electricity users, with the applicant's name matching the meter owner, and may use the program only once.**post author · statement](https://dgw.tmarket.io/claims/01a1e013-50a1-7b60-b360-a8af1579425b) [**On 27 October 2026, an 8 MW solar facility built by Elomay Solar Italy Nine S.r.l. was successfully connected to Italy's national electricity grid and began producing electricity.**אלומיי · statement](https://dgw.tmarket.io/claims/01a1de08-1cc9-751f-bfcb-9f16c3de6def) [**The company announced on 6 October 2026 the grid connection of the first part of an 87 MW solar facility.**אלומיי · statement](https://dgw.tmarket.io/claims/01a1de08-1d37-7d13-a3e5-c3aa652f36bf) [**争取 2027 年 12 月底具备投产运营条件。**武汉天源公告 · commitment](https://dgw.tmarket.io/claims/01a1cbe4-b5ed-7d94-bd0f-951aa1a6fc1e)

[All claims](https://dgw.tmarket.io/claims)

```json
{"@context":"https://schema.org","@graph":[{"@id":"https://dgw.tmarket.io/#website","@type":"WebSite","description":"Decisions, events and falsifiable forecasts from 4,500+ Telegram channels — every claim cited. Read free.","name":"DecisionGateway","url":"https://dgw.tmarket.io/","publisher":{"@id":"https://dgw.tmarket.io/#identity"}},{"@id":"https://dgw.tmarket.io/claims/01a1e013-50ae-727c-882e-2fed2189e8eb#webpage","@type":"WebPage","description":"statement by post author, recorded 2026-11-10 — verbatim quote and source citation.","name":"Each participating meter must have 5 to 10 kWp capacity, installation is limited to registered… — post author — DecisionGateway","url":"https://dgw.tmarket.io/claims/01a1e013-50ae-727c-882e-2fed2189e8eb","breadcrumb":{"@id":"https://dgw.tmarket.io/claims/01a1e013-50ae-727c-882e-2fed2189e8eb#breadcrumb"},"isPartOf":{"@id":"https://dgw.tmarket.io/#website"},"potentialAction":[{"@type":"ReadAction","target":["https://dgw.tmarket.io/claims/01a1e013-50ae-727c-882e-2fed2189e8eb"]}]},{"@id":"https://dgw.tmarket.io/#identity","@type":"Organization","name":"DecisionGateway","url":"https://dgw.tmarket.io"},{"@id":"https://dgw.tmarket.io/claims/01a1e013-50ae-727c-882e-2fed2189e8eb#breadcrumb","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","name":"Home","item":"https://dgw.tmarket.io","position":1},{"@type":"ListItem","name":"Claims","item":"https://dgw.tmarket.io/claims","position":2},{"@type":"ListItem","name":"Each participating meter must have 5 to 10 kWp capacity,…","position":3}]},{"@id":"https://dgw.tmarket.io/claims/01a1e013-50ae-727c-882e-2fed2189e8eb#/schema/quotation/1","@type":"Quotation","dateCreated":"2026-11-10","isBasedOn":"https://t.me/stock17168/11815","text":"參與系統每顆電表裝置容量須為5至10瓩（kWp），僅限透過已登記的安裝業者施工，須於2027年8月31日前提出併網申請，並於2027年9月30日前完成併網","url":"/claims/01a1e013-50ae-727c-882e-2fed2189e8eb"}]}
```

## Sitemap

See the full [sitemap](https://dgw.tmarket.io/sitemap.md) for all pages.