---
title: "Particular attention was paid to construction of the new Tashkent International Airport, a 1,000 MW… — post author — DecisionGateway"
description: "statement by post author, recorded 2026-11-05 — verbatim quote and source citation."
canonical_url: "https://dgw.tmarket.io/claims/01a1e50a-d763-7735-b1fd-5a655ba7c6c5"
meta:
  "og:description": "statement by post author, recorded 2026-11-05 — verbatim quote and source citation."
  "og:image": "https://dgw.tmarket.io/og.jpg"
  "og:image:alt": "DecisionGateway — a cluster of glowing dots pulling toward one bright center on dark"
  "og:image:height": "630"
  "og:image:width": "1200"
  "og:title": "Particular attention was paid to construction of the new Tashkent International Airport, a 1,000 MW… — post author — DecisionGateway"
  "twitter:image": "https://dgw.tmarket.io/og.jpg"
---

> Index of every page on this site: [llms.txt](https://dgw.tmarket.io/llms.txt)

statementSaid on 2026-11-05

# **Particular attention was paid to construction of the new Tashkent International Airport, a 1,000 MW wind power plant, the Syrdarya-2 thermal power plant and healthcare facilities.**

A statement by post author, said on 2026-11-05. Statements are as reported by the cited publishers — not verified by DecisionGateway.

> *Yangi Toshkent xalqaro aeroporti, quvvati 1000 MVt bo‘lgan shamol elektr stansiyasi, «Sirdaryo-2» issiqlik elektr stansiyasi va tibbiyot obyektlarini qurishga alohida e’tibor qaratildi.*

miit\_uzPublished 2026-11-05 [ Read source](https://t.me/miit_uz/20592)

## **Discussion**

## **Related claims**

[**Phone registration in customs at Toshkent airport has been restored.**post text · statement](https://dgw.tmarket.io/claims/01a1ef70-d115-7703-92a6-67ff5538844f) [**Privileges will be granted for major urban development projects in Yangi Toshkent.**the post · prediction](https://dgw.tmarket.io/claims/01a1ef72-d49b-7448-8f8d-9d65d03033de) [**“Daryo” contacted the Toshkent shahar hokimligi to clarify whether umumiy ovqatlanish shoxobchalari may install stol, yozgi terrasa and other konstruksiyalarni on trotuarlarga, and if so, what the procedure is.**“Daryo” · investigation](https://dgw.tmarket.io/claims/01a1dda6-b4dd-7873-9982-798beb1536f9) [**Construction of the joint Russian-Uzbek technopark "Bekabad" has started in Tashkent region.**rustorgpred · statement](https://dgw.tmarket.io/claims/01a1b679-6b56-7e3b-a7b5-9ca69b287f8d) [**The updated general scheme through 2042 envisages construction of 88.5 GW of new capacity and modernization of 66.4 GW.**post author · statement](https://dgw.tmarket.io/claims/01a1f543-7457-7555-aa14-ca24c8ef57bd) [**Partial traffic restrictions were introduced due to construction of the second stage of Tarlan Astana on Syganak from Tole bi to Aitmatova, on Aitmatova from Syganak to Mukhamedkhanova, and on sections of Turan Avenue.**bessimptomno · statement](https://dgw.tmarket.io/claims/01a1e8e4-a9af-749c-983b-d946332cf9a0)

[All claims](https://dgw.tmarket.io/claims)

```json
{"@context":"https://schema.org","@graph":[{"@id":"https://dgw.tmarket.io/#website","@type":"WebSite","description":"Decisions, events and falsifiable forecasts — every claim cited to its public source. Read free.","name":"DecisionGateway","url":"https://dgw.tmarket.io/","publisher":{"@id":"https://dgw.tmarket.io/#identity"}},{"@id":"https://dgw.tmarket.io/claims/01a1e50a-d763-7735-b1fd-5a655ba7c6c5#webpage","@type":"WebPage","description":"statement by post author, recorded 2026-11-05 — verbatim quote and source citation.","name":"Particular attention was paid to construction of the new Tashkent International Airport, a 1,000 MW… — post author — DecisionGateway","url":"https://dgw.tmarket.io/claims/01a1e50a-d763-7735-b1fd-5a655ba7c6c5","breadcrumb":{"@id":"https://dgw.tmarket.io/claims/01a1e50a-d763-7735-b1fd-5a655ba7c6c5#breadcrumb"},"isPartOf":{"@id":"https://dgw.tmarket.io/#website"},"potentialAction":[{"@type":"ReadAction","target":["https://dgw.tmarket.io/claims/01a1e50a-d763-7735-b1fd-5a655ba7c6c5"]}]},{"@id":"https://dgw.tmarket.io/#identity","@type":"Organization","name":"DecisionGateway","url":"https://dgw.tmarket.io"},{"@id":"https://dgw.tmarket.io/claims/01a1e50a-d763-7735-b1fd-5a655ba7c6c5#breadcrumb","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","name":"Home","item":"https://dgw.tmarket.io","position":1},{"@type":"ListItem","name":"Claims","item":"https://dgw.tmarket.io/claims","position":2},{"@type":"ListItem","name":"Particular attention was paid to construction of the new…","position":3}]},{"@id":"https://dgw.tmarket.io/claims/01a1e50a-d763-7735-b1fd-5a655ba7c6c5#/schema/quotation/1","@type":"Quotation","dateCreated":"2026-11-05","isBasedOn":"https://t.me/miit_uz/20592","text":"Yangi Toshkent xalqaro aeroporti, quvvati 1000 MVt bo‘lgan shamol elektr stansiyasi, «Sirdaryo-2» issiqlik elektr stansiyasi va tibbiyot obyektlarini qurishga alohida e’tibor qaratildi.","url":"/claims/01a1e50a-d763-7735-b1fd-5a655ba7c6c5"}]}
```

## Sitemap

See the full [sitemap](https://dgw.tmarket.io/sitemap.md) for all pages.
