---
title: "793.7 million tenge was directed to repairing the sluice gates of the Основное бөгені in Шортанды… — the post — DecisionGateway"
description: "commitment by the post, recorded 2026-11-11 — verbatim quote and source citation."
canonical_url: "https://dgw.tmarket.io/claims/01a1ea8b-368e-7c71-a26f-f428cf9ad342"
meta:
  "og:description": "commitment by the post, recorded 2026-11-11 — verbatim quote and source citation."
  "og:image": "https://dgw.tmarket.io/og.jpg"
  "og:image:alt": "White network of connected nodes crossed by a timeline on black"
  "og:image:height": "1024"
  "og:image:width": "1024"
  "og:title": "793.7 million tenge was directed to repairing the sluice gates of the Основное бөгені in Шортанды… — the post — DecisionGateway"
  "twitter:image": "https://dgw.tmarket.io/og.jpg"
---

> Index of every page on this site: [llms.txt](https://dgw.tmarket.io/llms.txt)

commitmentSaid on 2026-11-11

# **793.7 million tenge was directed to repairing the sluice gates of the Основное бөгені in Шортанды ауданы, with a spillway channel to be built and the earth dam on the Жолболды өзені bed to be reinforced with stone.**

A commitment by the post, said on 2026-11-11. Statements are as reported by the cited publishers — not verified by DecisionGateway.

> *🟦793,7 млн теңге – Шортанды ауданындағы Основное бөгенінің шлюз-қақпаларын жөндеуге бағытталды.*

kzgovernmentPublished 2026-11-11 [ Read source](https://t.me/kzgovernment/27976)

## **Discussion**

## **Related claims**

[**793.7 million tenge was allocated for repairing the sluice gates on the Основная dam in the Шортанды area, including a flood spillway and strengthening the earthen dam with rock fill in the bed of реки Жолболды.**post author · commitment](https://dgw.tmarket.io/claims/01a1ea8a-f6f5-7ed0-9757-e828363c922b) [**314.1 million tenge is provided for reconstruction of the Иванковская бөгені in Бұланды ауданы, restoring a 49-meter spillway structure and six water intake chambers.**the post · commitment](https://dgw.tmarket.io/claims/01a1ea8b-369f-7b89-9c23-701e4684884a) [**In Макинск қаласы of Бұланды ауданы, a dam with sluices and concrete channels was built, allowing safe passage of meltwater from the forest-steppe zone; in Астрахан ауданы a 4.7 km section of the Қалқұтан өзені was cleaned and deepened, eliminating the flood threat to settlements.**the post · statement](https://dgw.tmarket.io/claims/01a1ea8b-3716-703b-965a-c648b9bea8e5) [**314.1 million tenge was allocated for reconstruction of the Иванковская dam in the Бұланды area, including full restoration of a 49-meter spillway and six water intake chambers.**post author · commitment](https://dgw.tmarket.io/claims/01a1ea8a-f70b-78a8-a1b2-05c39f6f42db) [**4.4 billion tenge was allocated for deepening, cleaning and strengthening the bed of the Қалқұтан river in Астрахан ауданы, with three sections totaling 20.8 km to be cleaned and two earth dams built in Ескі Қалқұтан and Қалқұтан ауылдары.**the post · commitment](https://dgw.tmarket.io/claims/01a1ea8b-3675-7709-b5a5-b1667ddbf66d) [**Spending on infrastructure in the Goderdzi and Zelenoe ozero area will be increased 5.4 times, to 4.47 million lari.**Правительство Аджарии · statement](https://dgw.tmarket.io/claims/01a1ef09-f852-75b0-8787-74c17bab51ac)

[All claims](https://dgw.tmarket.io/claims)

```json
{"@context":"https://schema.org","@graph":[{"@id":"https://dgw.tmarket.io/#website","@type":"WebSite","description":"Decisions, events and falsifiable forecasts — every claim cited to its public source. Read free.","name":"DecisionGateway","url":"https://dgw.tmarket.io/","publisher":{"@id":"https://dgw.tmarket.io/#identity"}},{"@id":"https://dgw.tmarket.io/claims/01a1ea8b-368e-7c71-a26f-f428cf9ad342#webpage","@type":"WebPage","description":"commitment by the post, recorded 2026-11-11 — verbatim quote and source citation.","name":"793.7 million tenge was directed to repairing the sluice gates of the Основное бөгені in Шортанды… — the post — DecisionGateway","url":"https://dgw.tmarket.io/claims/01a1ea8b-368e-7c71-a26f-f428cf9ad342","breadcrumb":{"@id":"https://dgw.tmarket.io/claims/01a1ea8b-368e-7c71-a26f-f428cf9ad342#breadcrumb"},"isPartOf":{"@id":"https://dgw.tmarket.io/#website"},"potentialAction":[{"@type":"ReadAction","target":["https://dgw.tmarket.io/claims/01a1ea8b-368e-7c71-a26f-f428cf9ad342"]}]},{"@id":"https://dgw.tmarket.io/#identity","@type":"Organization","name":"DecisionGateway","url":"https://dgw.tmarket.io"},{"@id":"https://dgw.tmarket.io/claims/01a1ea8b-368e-7c71-a26f-f428cf9ad342#breadcrumb","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","name":"Home","item":"https://dgw.tmarket.io","position":1},{"@type":"ListItem","name":"Claims","item":"https://dgw.tmarket.io/claims","position":2},{"@type":"ListItem","name":"793.7 million tenge was directed to repairing the sluice…","position":3}]},{"@id":"https://dgw.tmarket.io/claims/01a1ea8b-368e-7c71-a26f-f428cf9ad342#/schema/quotation/1","@type":"Quotation","dateCreated":"2026-11-11","isBasedOn":"https://t.me/kzgovernment/27976","text":"🟦793,7 млн теңге – Шортанды ауданындағы Основное бөгенінің шлюз-қақпаларын жөндеуге бағытталды.","url":"/claims/01a1ea8b-368e-7c71-a26f-f428cf9ad342"}]}
```

## Sitemap

See the full [sitemap](https://dgw.tmarket.io/sitemap.md) for all pages.
